March 14, 2011
Rankin-Hinds Pearl River Flood and Drainage Control District Board Chairman Gary Rhoads said that the U.S. Army Corps of Engineers is responsible for almost doubling the cost of a flood-control feasibility study.
Stories this photo appears in:
Flood Study Cost Increase Spurs Finger Pointing
Rankin-Hinds Pearl River Flood and Drainage Control District Board Chairman Gary Rhoads said today that the U.S. Army Corps of Engineers is to blame for cost increases in a multi-million-dollar ...
Little Love for Levees
The meeting room for the Rankin-Hinds Pearl Flood and Drainage Control District Levee Board in Flowood filled with rancor Monday, Feb. 8, after the board learned that the state Legislature ...
Comments
Use the comment form below to begin a discussion about this content.
comments powered by Disqus