May 6, 2009
The flood control board met with advocates of the lower lake plan last week, though supporters of a more daring two lakes plan are still fighting hard.
Stories this photo appears in:
Corps Says Lakes Plans Dead, Wants Levees
The U.S. Army Corps of Engineers has told the local levee board that it has to agree on a flood-control plan for the Pearl River by the end of Septemberand ...
Two Lakes Back on the Table
Engineers favoring a plan to flood the Pearl River and create a myriad of islands say the plan will be cheaper than a similar plan involving a smaller lake and ...
‘Obstructionist for Flood Control'
The battle over Two Lakes is back on. After years of infighting and millions of dollars spent on impact and engineering studies, the Rankin-Hinds Pearl River Flood and Drainage Control ...
Comments
Use the comment form below to begin a discussion about this content.
comments powered by Disqus